top of page

TPE Electrical Contracting is performing full electrical construction for a large commercial facility in Longmont, Colorado. The generator installation shown here represents one phase of an ongoing multi-scope project.

This portion of work includes installation of dual standby generators and associated exterior infrastructure to support backup power for the facility. Due to project restrictions, interior work cannot be shown, but the overall scope includes complete building electrical systems.

Projects of this scale require coordination across multiple phases, with electrical systems being installed alongside structural, mechanical, and site development progress. Each phase must be executed cleanly and correctly to keep the overall project moving forward.

The generator installation reflects TPE’s approach to field execution, organized layout, clean conduit work, and coordination with other trades to support long-term performance and serviceability.

Generator installation as part of a larger commercial electrical construction project.

  • Dual generator placement and installation

  • Exterior conduit and raceway routing

  • Equipment power connections

  • Standby power infrastructure integration

  • Coordination with site and construction teams

  • Clean exposed conduit layout

  • Ongoing support as part of full building electrical scope


Commercial Generator SENS Facility

Longmont, CO

2026

Generator installation scope as part of an ongoing full electrical buildout for a large commercial facility in Longmont, Colorado.

bottom of page